Language
Negotiable
The date of payment from buyers deliver within days
Beijing
Long-term effective
2017-08-14 16:12
114
sakopowersupply(Ms.)
Beijing
Shenzhen King SAKO, C Building,HuangGangLing Industrial, Park, XiXiang, BaoAn, Shenzhen, Guangdong, China (518126)
MODEL SPECIFICATION |
SKN-MG500V | SKN-MG1000VA | SKN-MG2000VA | SKN-MG3000VA | SKN-MG4000VA |
SKN-MG5000VA |
SKN-MG8KVA | SKN-MG10KVA |
DC INPUT | ||||||||
InputVoltage(VDC) | 12 | 12 | 24 | 48 | 48 | 48 | 96 | 96 |
InputCurrent(A) | 52 | 52 | 104 | 78 | 104 | 130 | 104 | 130 |
AC BYPASS | ||||||||
Input AC Range (VAC) | 110VAC~270VAC | 165VAC~265VAC | ||||||
Input Frequency Range (Hz) | Same As The City Power | |||||||
Charge Current (A) | 8-12AMP | 15-25AMP | ||||||
Transfer Time (ms) | UPS Setting :<= 4ms Generator :<= 1s | |||||||
AC OUTPUT | ||||||||
Output Power (W) | 300 | 600 | 1200 | 1800 | 2400 | 3000 | 4800 | 6000 |
Output Voltage (VAC) | 220VAC ± 3% (In Inverter Model) | |||||||
Output Frequency (Hz) | 50Hz/60Hz | |||||||
Frequency Precision (Hz) | 50±1% / 60±1% (In Inverter Model) | |||||||
Wave Distortion (TCKJ) | <= 5% | |||||||
Power Factor (PF) | 0.6 | |||||||
Overload Capacity | 100%~120%, 25s 120%~200%, 1s >200%, 0.1s | |||||||
Inversion Efficiency | ≥ 82% | ≥ 85% | ||||||
Bypass Transfer Time (ms) | ≤ 4ms | |||||||
PROTECTION | ||||||||
Protection | Over temperature/over load/over voltage/low battery/low voltage/input low/high voltage/short current protection | |||||||
AMBIENT | ||||||||
Noise (dB) | ≤ 40dB (1 meter) | |||||||
Temperature | '-20°C~45°C degree | |||||||
Humidity | 0~95% (No Condensation) | |||||||
Sea Level (m) | ≤ 1500m | |||||||
DIMENSION | ||||||||
Package L×W×H (mm) | L520×W240×H327 mm | L600×W335×H475 mm | L720×W470×H715 mm | |||||
Weight (KG) | 9.5KG | 15KG | 22KG | 28KG | 35KG | 38KG | 71KG | 81KG |